Construction Updates

It’s been a while since our last post so there’s a lot of progress to report.


The drive-in cooler is assembled, and waiting for refrigeration to be installed next week.


We’ve started painting the taproom and building the bar.


The first Heat Pump/Furnace units have been installed. Eventually there will be five separate units installed.