Framing begins

The studs arrived with only two hours left to work, but the crew made a good start on framing the walls. This will be the wall between the taproom and the brewery, and you can start to see the location of big viewing windows we’re installing behind the bar so everyone can observe the brewery.


Moving to the back of the building, the final part of our drainage system is ready for laying pipe. After connecting our new plumbing to the sanitary line (that drains everything out to the sewer) inspection with a fiber optic camera revealed that the existing sanitary line is corroded and in risk of collapse. Theref we’re extending our new drain plumbing all the way out to the sewer connection.

Leave a Reply